By
manufacture of concrete the sheathing is necessary.
Presence of
oil, paint, polymeric coating on a surface of a grid and an armature is
inadmissible. Preserve the plastered
surfaces and concrete constructions to against drying within the first 12 days.
Cold junctions - occurring at different time’s cementation of a plaster coating,
mating of concrete constructions execute as follows: to loosen with a metal
brush of a surface of seams, to humidify, cementing by PROGRESS® (creamy solid-to-liquid
ratio).
Operation
under a pressure of water is not supposed.
All operations
should be executed at temperature is not lower 5 C.
Contact
with approved personal for operations at negative temperatures.
In order to
prevent effect of false cementation time of kneading of concrete and mortar
after temper water not less than 5 minutes.
|